Deep Excavation Support

:Rotary bored and cast-in-situ piles for a range of ground conditions and structural requirements.

Our services

Safe Shoring and Excavation Support for Deep Excavations

We provide shoring and temporary earth-retention solutions that support safe excavation and construction, particularly where site boundaries, adjacent structures, existing infrastructure, groundwater or excavation depths require controlled ground retention. Systems are selected and executed in accordance with approved engineering designs, geotechnical conditions and applicable safety requirements.

  • Operational Excellence
  • Continuous Innovation
  • Business Integrity
  • Sustainable Growth
Need Help? Call us

888-4000-234

Shoring Systems

  • Sheet piling
  • Contiguous pile shoring
  • Secant pile shoring
  • Soldier piles and lagging
  • Temporary retaining and excavation support systems
  • Internal strutting and bracing
  • Waler and strut systems
  • Ground anchoring / tie-back systems, where permitted and applicable
  • Shoring for basements, infrastructure and utility excavations
  • Shoring adjacent to existing buildings and structures
  • Dewatering coordination alongside excavation support works

How We Execute Shoring

  • Review of approved shoring and temporary works designs
  • Verification of existing site conditions
  • Surveying and setting out
  • Mobilization of suitable piling and shoring equipment
  • Installation of piles, lagging, walers, struts, braces or anchors as specified
  • Excavation in controlled stages
  • Monitoring of shoring systems and surrounding areas
  • Protection of adjacent structures, utilities and site boundaries
  • Regular inspection of temporary works
  • Strengthening where required by approved engineering instructions
  • Removal of temporary systems on completion, where applicable
  • Completion records and as-built documentation

Choosing the Right System

The right shoring system depends on excavation depth, soil and geological conditions, groundwater, adjacent buildings, site boundaries and working space, existing utilities, excavation sequence, structural loading and surcharge, project duration, access limitations and the approved temporary works design.

All shoring works follow approved drawings, engineering designs, method statements, risk assessments, project specifications and consultant requirements.